Refurbishing an existing Victorian building.
This project at Newcastle High School for Girls for the the Girls’ Day School Trust includes the refurbishment of the existing Victorian building (including a number of existing extensions added at various periods) and the full strip-out and replacement of existing M&E.
There was an extension infill to the existing building and various repairs to the façade as well as a new build on site adjoining the existing building.
In addition, there was refurbishment works to existing hard/soft landscaping. We overcame potential challenges with the site logistics as the school is in a very tight location with neighbouring houses.
The scheme has 100% LED lighting, highly efficient heat recovery units, fabric ductwork to new performance space, extensive CAT6A data infrastructure, and traditional steel and copper pipework installation.
Share
Explore more of our education projects
Contact us
Get in touch to chat about your construction project.