BAE Strategic Bulk Storage

Strategic Bulk Storage For BAE

Home Projects Strategic Bulk Storage For BAE
BAE - Strategic Bulk Storage

PART OF AN EIGHT YEAR £300M INVESTMENT FOR BAE

The new SBS facility will provide an off-site logistics operation required to support BAEs marine business.

The main storage area includes wide aisle racking to a height of 12m, open storage for large items of equipment up to 80 tonnes in weight together with two overhead cranes, one with a capacity of 80 tonnes and the other 20 tonnes.

In addition, the development also includes a new high voltage substation, switch room and communications room.

BAE Strategic Bulk Storage

BIM LEVEL 2 DESIGN COMPLIANT

Providing substantial programme benefits and cost savings

Utilising detailed geotechnical analysis and long term differential settlement modelling we were able to provide BAE with an engineered foundation solution to accommodate the imposed loads and predicted long term settlements.

The project was designed in full compliance with BIM level 2 requirements with the whole design team working in a fully federated 3D model under the lead designer, RPS. Our BIM implementation plan complies with PAS 1192-2 ultimately enabling BAE to utilise data captured during the delivery phase of the project to manage optimal whole life costs of the new building.

This project is part of an eight year £300M investment programme for BAE which includes other new build facilities as well as the refurbishment of existing infrastructure in preparation for the construction of the successor to the Vanguard class.

I was very pleased to see the standard of safety from the security guard on site and the induction process through to the operations on site. It was evident to me that safety was not just visible but also in the culture of the site.”

Allan Day

Facilities Programme Director,

Contact us

Get in touch to chat about your construction project.